Lamar Mobility Corridor Study / Estudio del pasillo Lamar para la movilidad

Background information on the City of Austin’s Lamar project. The rough timeline is:
Sept-Oct gather information
Dec 2011 draft report
Jan-Feb 2012 city boards, commission and council
Nov 2012 bond referendum

Sept 20, 2011 introductory presentation (solo inglés)

Lamar hoja de datos

Lamar cuestionario

Objective T.6: Improve the safety of pedestrians traveling along North Lamar Boulevard.
Objective T.8: Improve traffic flow along North Lamar Boulevard.

Advertisements

About nlct

The North Lamar/Georgian Acres neighborhood is a diverse and connected mixed-use area bounded by 183, North Lamar, Braker, and I-35. The "North Lamar/Georgian Acres contact team" (NLCT) works to achieve our vision of a safe healthy neighborhood for residents, property owners, and businesses.
This entry was posted in Lamar Boulevard, transportation, transporte. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s